FREE BUSINESS TOOL · NO ACCOUNT NEEDED
Staff shift capacity planner
Estimate complete teams and whole jobs for a shift after breaks and a travel buffer.
Runs in your browser. Inputs are not sent or saved, and no AI request is used.
Review and edit
How to use the result
An end time earlier than the start means the shift ends the next day. The estimate assumes identical shifts and job durations; travel is a total shift buffer. It does not check employment rules, skills, route distances or actual availability.
Continue your workflow
WORKED EXAMPLE · FICTIONAL DETAILS
Worked example: how many jobs fit into a shift?
Suppose four staff work from 09:00 to 18:00. Enter 60 minutes of breaks, 60 minutes of total shift travel buffer, 120 minutes per job and two staff per job.
- Shift length per person: 9 hours = 540 minutes.
- Time after breaks and travel: 540 − 60 − 60 = 420 minutes.
- Complete teams: 4 ÷ 2 = 2.
- Whole jobs per team: 420 ÷ 120 = 3.5, rounded down to 3.
- Estimated capacity: 2 teams × 3 jobs = 6 whole jobs.
Do not treat spare minutes as another booking
Each team has 60 minutes left in this simplified model, which does not fit another 120-minute job. Travel is the total buffer for the entire shift, not travel per job. If routes take longer, increase the buffer. Staff outside a complete team do not add another team.
This estimate does not check skills, actual availability or employment rules. Use the weekly worker-hour planner for a broader view, then draft a proposed appointment. Confirm the real schedule before accepting the booking.